Feature:
The whole machine adopts microcomputer control, with Panasonic servo motor control system. Arbitrary fixed-length, accurate and stable photoelectric tracking, stopping automatically when the label is lost. Automatic pressure synchronous punching and synchronous sealing. Automatic counting, and can set count alarm. Automatic constant temperature, firm and smooth sealing.
Main Technical Variables:
Model: |
RJHQ-800 |
Length of bag-making: |
250-750mm |
Width of bag-making: |
250-600mm |
Pre-folded edge: |
50-75mm |
Bottom-inserted edge: |
20-70mm |
Thickness of film: |
HDPE 0.04-0.1mm
LDPE 0.04-0.08MM |
Speed of bag-making: |
Soft hand bag 60pcs/min
Patch bag 60pcs/min
Rope bag 70pcs/min
Pre-folded punching bag 75pcs/min |
Total power: |
13KW |
Machine dimension: |
8200×3100×1870mm |
Machine weight: |
3500kg |
Air compressor not: |
6HP |
The length of the soft hand: |
360mm |
The thickness of the soft hand: |
0.08-0.25mm |
1.Is your company trading company or manufacturer?
We are manufacturer specialized in plastic machine for more than 35 years, all of our engineer with more than 20 years experience.
2. Where is your factory? How can i visit your company?
Our factory is located in Ruian city,zhejiang province, China.
Its about 40 minutes from shanghai by plane(4 hours by train). We will pick you up on airport or station. Welcome to visit our manufacture.
3 What's the scale of your company?
Our company covers 14000 square meter, over 11000 square meter of which is bulding area, consisting over 100 staffs, 20 engineers for technical support.
4 How long is your delivery time?
Our delivery time is 30-45 days. Ugently, we can make your machine first. About 10 days.
5 What's your warranty policy?
18 month guarantee and 1 year after-sales maintenance.
6 What package do you use for the product?
Covered with plastic film. Wooden box package need extra cost .
7 Does your manufacture provide installation service?
Our engineer can go to customer factory to installation. Buyer should prepare materials to test the machine in advance and should be responsible for the cost of supplier's technician, including round air tickets, visa cost, accommodation and salary since the day start out until the day arriving at factory.
8 What are your terms of payment?
We accept T/T, L/C. western union.
9 How could we do if the parts broken within warranty?
We would express the free replacement parts during the warranty date.
10 Does your engineer understand English?
Our engineer understand a little English. But don't worry, We have professional translators.And All our engineer have more than 20 years machine installation experience.