Customization: | Available |
---|---|
After-sales Service: | 1 Year |
Type: | Three-Layer Co-extrusion Film Blowing Machine |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Characteristics:
It is used for blowing high-low pressure polyethylene, which has been widely used for producing laminating film, packing film, agricultural covering film, bag or film for textile and clothing and other packing material. The main motor adopts frequency control of motor speed to improve the speed regulating stability of main motor and save electricity by 30%. The screw and material barrel adopt 38 chrome-molybdenum aluminum which has been nitrogen treated and the traction frame adopts lifting type. No matter what size the film is, big or small, it can achieve the best effect of cooling.
OPTIONAL EQUIPMENT:
1) AUTO LOADER
2) EMBOSSING ROLLER
3) FILM SURFACE TREATER
4) DIE ROTARY DEVICE
5) AIR COMPRESSOR
6) MECHANICS SCREEN CHANGER
7) UP AND DOWN
Main Technical Parameter:
Model | SJB50 | SJB55 | SJB65 | SJB65-1 |
Screw Diameter | 50mm | 55mm | 65mm | 70mm |
Screw Speed | 10-100r/min | 10-100r/min | 10-100r/min | 10-100r/min |
Power of Main Motor Max Output | 11Kw 35kg/h | 15Kw 50kg/h | 22Kw 65kg/h | 22kw80kg/h |
Max.Folding Width of Film | 600mm | 800mm | 1000mm | 1200mm |
Total Power | 22kw | 26kw | 30kw | 36kw |
weight of machine | 2T | 2.3T | 2.6T | 3T |
Overll Demensions | 4000*1800*4600mm | 4200*2000*4900mm | 4600*2300*5600mm | 4800*2500*5800mm |
1.Is your company trading company or manufacturer?
We are manufacturer specialized in plastic machine for more than 35 years, all of our engineer with more than 20 years experience.
2. Where is your factory? How can i visit your company?
Our factory is located in Ruian city,zhejiang province, China.
Its about 40 minutes from shanghai by plane(4 hours by train). We will pick you up on airport or station. Welcome to visit our manufacture.
3 What's the scale of your company?
Our company covers 14000 square meter, over 11000 square meter of which is bulding area, consisting over 100 staffs, 20 engineers for technical support.
4 How long is your delivery time?
Our delivery time is 30-45 days. Ugently, we can make your machine first. About 10 days.
5 What's your warranty policy?
18 month guarantee and 1 year after-sales maintenance.
6 What package do you use for the product?
Covered with plastic film. Wooden box package need extra cost .
7 Does your manufacture provide installation service?
Our engineer can go to customer factory to installation. Buyer should prepare materials to test the machine in advance and should be responsible for the cost of supplier's technician, including round air tickets, visa cost, accommodation and salary since the day start out until the day arriving at factory.
8 What are your terms of payment?
We accept T/T, L/C. western union.
9 How could we do if the parts broken within warranty?
We would express the free replacement parts during the warranty date.
10 Does your engineer understand English?
Our engineer understand a little English. But don't worry, We have professional translators.And All our engineer have more than 20 years machine installation experience.