Eight Lines High Speed Bag Making Machine

Product Details
Customization: Available
Voltage: 220V
Speed: High
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2007

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
to see all verified strength labels (31)
  • Eight Lines High Speed Bag Making Machine
  • Eight Lines High Speed Bag Making Machine
  • Eight Lines High Speed Bag Making Machine
  • Eight Lines High Speed Bag Making Machine
  • Eight Lines High Speed Bag Making Machine
  • Eight Lines High Speed Bag Making Machine
Find Similar Products
  • Overview
  • FAQ
Overview

Basic Info.

Model NO.
SHXJ-E1000/1200/1500
Continuous-Rolled
Yes
Sealing & Cutting
Heat-Sealing Cold-Cutting
Layer
Double
Machine Type
Sealing Machine
Computerized
Computerized
Type
Plastic Bag Making Machine
Model
Shxj-E1000/1200/1500
Max.Width of Sealing & Cutting (mm)
1500
Length of Sealing & Cutting(mm)
200-1000
Speed of Bag-Making(PC/Min)
40*100*8
Power of Motor(Kw)
5
Machinery Weight(Kg)
3.0
Transport Package
PVC Package or Woodern Package
Trademark
SANBI
Origin
China
HS Code
847730900
Production Capacity
200sets

Product Description

Eight Lines High Speed Bag Making Machine

Eight Lines High Speed Bag Making Machine
Description :
The bag making machine is a machine that makes all kinds of plastic packaging bags or other material packaging bags. Its processing range is various sizes and thicknesses of different plastic or other material packaging bags. Generally speaking, plastic packaging bags are the main product.
1,Main feature:
1. Automatic computer control.
2. From roll film to finished bag, it is one-time completion.
3. Servo motor sets the length to control the bag making speed.
4. Automatic feeding, torque motor automatically controls tension.
5. The computer will automatically stop operation when the system is blocked by feeding and bags.
6. High-efficiency operation saves manpower and time.
7. Adopt heat sealing and cold cutting device.

2,Operating procedures:
1. Preparations before starting up
1. Check whether there is dust and debris around the equipment and remove them.
2. Load the film rolls according to the requirements of the production notice.
3. Adjust the size of the bag according to the production notice and process documents, install the heat-sealing knife, and initially adjust the positions of the slitting knife and the heat-sealing knife.
4. Turn on the power and set the temperature of the heat-sealing knife according to the requirements of the process documents.
5. Enter the relevant data of bag making and the required number of each bundle.
6. Select the edge of the pattern with large color difference to adjust the sensitivity of the optical eye to make it meet the requirements.

3,Boot
1. Start the main motor, run at low speed, and then adjust the side position control to halve the film in the middle position.
2. Adjust the left and right nip rollers to align the left and right films, and adjust the front and back nip rollers to align the patterns.
3. Adjust the heat-sealing knife to make the heat-sealing within the required range of the bag.
4. Adjust the slitting blade to the desired position, and adjust the punching position to the scissors mouth.
5. Preliminarily adjust the machine speed, take a flat sample bag for preliminary inspection, if it does not meet the specified requirements, take a step flat sample bag for heat-sealing value test.
6. Sort the bags produced, and select the bags with quality defects (such as folds, tunnels, pattern width, knife lines, poor heat sealing, four seals, etc.) and tie them up according to the regulations.
7. The machine quality inspector will carry out the inspection. After the inspection is qualified, the certificate will be attached and sent to the quality inspection room for random inspection.
8. During the production process, observe the bag-making situation at any time and find abnormalities, and adjust immediately.

 

4,Shutdown

1. Turn off the main power switch, and then turn off the power switches of each part.
2. Clean up the sanitation of the machine and the site, and send the products to the general inspection room.
3. Make a record of on-duty and require accuracy and cleanliness.

 

 

Main Parameter:
Model 1000 1200 1500
Width of sealing & cutting(mm) 980 1180 1480
Length of sealing & cutting (mm) 200-1000 200-1000 200-1000
Speed of bag-making(pc/min) 40-100*8 40-100*8 40-100*8
Number of strip (pc) 8 8 8
Power of motor(kw) 3 4 5
Packing Dimensions(L*W*H)mm 1.6 2.2 2.8
Machinery Weight(kg) 8000*2000*2200 8000*2200*2200 8000*2500*2500
 
Eight Lines High Speed Bag Making MachineEight Lines High Speed Bag Making Machine

Eight Lines High Speed Bag Making Machine

Eight Lines High Speed Bag Making Machine

Eight Lines High Speed Bag Making Machine
Eight Lines High Speed Bag Making Machine

FAQ

1.Is your company trading company or manufacturer?
We are manufacturer specialized in plastic machine  for more than 35 years, all of our engineer with more than 20 years experience.

2. Where is your factory? How can i visit your company?
Our factory is located in Ruian city,zhejiang province, China.
Its about 40 minutes from shanghai by plane(4 hours by train). We will pick you up on airport or station. Welcome to visit our manufacture.

3 What's the scale of your company?
Our company covers 14000 square meter, over 11000 square meter of which is bulding area, consisting over 100 staffs, 20 engineers for technical support.

4 How long is your delivery time?
Our delivery time is 30-45 days. Ugently, we can make your machine first. About 10 days. 

5 What's your warranty policy?
18 month guarantee and 1 year after-sales maintenance.
 
6 What package do you use for the product?
Covered with plastic film. Wooden box package need extra cost .
 
7 Does your manufacture provide installation service?
Our engineer can go to customer factory to installation. Buyer should prepare materials to test the machine in advance and should be responsible for the cost of supplier's technician, including round air tickets, visa cost, accommodation and salary since the day start out until the day arriving at factory.

8 What are your terms of payment?
We accept T/T, L/C. western union.

9 How could we do if the parts broken within warranty?
We would express the free replacement parts during the warranty date.

10 Does your engineer understand English?
Our engineer understand a little English. But don't worry, We have professional translators.And All our engineer have more than 20 years machine installation experience.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier